NON-DESTRUCTIVE EVALUATION OF CORROSION RATEObjective: 1. Non Destructive Evaluation of corrosion rate in reinforced concrete using peizo sensors via EMI technique. Apparatus Used: 1. A Empty Tank 2. Brine Solution 3. PZT Patch 4. Volt Meter 5. Copper Rod as Cathode 6. Copper Rod Holder 7. Concrete cube containing a Rebar as Anode
Step-1: (a) Click on Add Button to bring Empty Tank.
Step-1: (b) Click on Tank to Place it on the position.
Step-1: (c) Click on Add Button to bring Brine Solution.
Step-1: (d) Click on Brine Solution to pour it into the Tank.
Step-1: (e) Click on Add Button to bring Concrete cube containing a Rebar.
Step-1: (f) Click on Rebar to place it in the tank contaning Brine Solution.
Step-1: (g) Click on Add Button to bring Copper Rod Holder.
Step-1: (h) Click on Add Button to bring Copper Rod.
Step-1: (i) Click on Copper Rod to fix it on the Copper Rod Holder.
Step-1: (j) Click on Next Button.
Step-2: (a) Click on Black Clip to attach wire with Copper Rod.
Step-2: (b) Click on Red Clip to attach wire with Rebar.
Step-2: (c) Switch on the power button of Volt Meter.
Step-2: (d) Click on Next button.
Condition of RC Specimen
Pristine/Healthy State
After 45 Days
Cracked Specimen after 120 Days
Condition of concrete cube and rebar after splitting
Cracked Specimen after
splitting at 45 days Cracked Specimen after splitting at 120 days Corroded bar removed from specimen at 120 days |